Contact Us

Canahot (Wuxi) Industrial Co.,ltd

Address: NO.1 Shixin Road Dongbeitang,Wuxi,Jiangsu China

Contact us:Kellywang

Tel: 0086-510-83771188

Fax:0086-510-83772775

Mob: 0086-13921106886

E-mail: kelly@canahot.com.cn


Other relevant system design instructions of the flame fuel can

- Oct 11, 2017 -

Because of the particularity of the flame fuel can, many related problems need to be considered in the design and production. One of the more important issues is insulation. This is because in the actual application, in the process of fuel combustion will release a lot of heat, so the flame fuel can needs to have a certain degree of heat insulation to ensure safety.


In the design of insulation, on the one hand, taking into account the heat insulation effect of the shell of the flame fuel can. On the other hand, the heat insulation effect of the pipe system should be taken into account. It not only requires the choice of the suitable material, but also needs to be supported by more advanced technology to achieve the purpose of protection.


The second important issue to be considered is that the tubing at the head of the flame fuel can should be provided with a corresponding sealing device and a protective sleeve. Usually, the casing sealing device has a good sealing, so that the leakage of gas can be prevented due to leakage of the pipeline. In addition, a certain amount of N2 is injected into the casing by the threaded joint to maintain positive pressure. A pressure gauge is also installed to monitor the pressure.

instructions.jpg

The second important issue to be considered is that the tubing at the head of the flame fuel can should be provided with a corresponding sealing device and a protective sleeve. Usually, the casing sealing device has a good sealing, so that the leakage of gas can be prevented due to leakage of the pipeline. In addition, a certain amount of N2 is injected into the casing by the threaded joint to maintain positive pressure. A pressure gauge is also installed to monitor the pressure.


It must be noted that, considering the particularity of the flame fuel tank, the design and manufacture of its sealing device must be carried out in strict accordance with the design requirements of the drawing., And the corresponding requirements must be met at the time of installation. 


In short, in the design and production process the flame fuel tank, we will continue to study, innovate and summarize it, in order to achieve greater progress, and lay a solid foundation for the long-term development in the future.


Related Industry Knowledge

Related Products

  • Gel Chafing Fuel For Refill Use
  • DEG Screw Cap Wick Chafing Fuel-the Safest Fuel For Buffet
  • Smokeless Fireplace Fuel For Outdoor
  • Ethanol Solid Gel Chafing Fuel,enviromental.green Product
  • 200G DEG Wick Chafing Fuel-the Safest Fuel For Buffet
  • Solid/gel Alcohol Paste for Outdoor Ignition, Isopropyl Alcohol Fuel, Smokeless Igniting Gel Wax