Safety specification of wick chafing fuel

- Nov 21, 2018 -

In order to strengthen the safety management of the wick chafing fuel during use and reduce accidents, some safety issues must be paid attention to. First, in the process of using a special burner, ensure that the fuel tank, liquid path, and fuel valve system are tight and there must be no leakage; the piping, joints, etc. of the fuel system should be ensured at a pressure of 0.3 MPa and 150°C without leakage.

 

Secondly, when filling the canned heat source fuel, it is also necessary to check the specific conditions of the transportation of the alcohol-based liquid fuel. At the same time, the ventilation and ventilation of the operation room are kept good, and the air and the closed air space should be installed with the exhaust and flammable gas alarm device. In addition, a post safety responsibility system and safe operating procedures should be established and hung in an eye-catching place in the operation room.

 

The post operator should insist on daily inspection of the safety of the valves, switches and flow control devices connected to the canned heat source. Mainly to check the fuel tank, pipeline, breathing valve, thermostatic mat, gasket and other safety conditions, inspection should be recorded. The use unit shall prepare an emergency plan and formulate corresponding safety precautions. safety specification

 

In order to strengthen the safety management of the wick chafing fuel during use and reduce accidents, some safety issues must be paid attention to. First, in the process of using a special burner, ensure that the fuel tank, liquid path, and fuel valve system are tight and there must be no leakage; the piping, joints, etc. of the fuel system should be ensured at a pressure of 0.3 MPa and 150 ° C, without leakage.

 

Secondly, when filling the canned heat source fuel, it is also necessary to check the specific conditions of the transportation of the alcohol-based liquid fuel. At the same time, the ventilation and ventilation of the operation room are kept good, and the air and the closed air space should be installed with the exhaust and flammable gas alarm device. In addition, a post safety responsibility system and safe operating procedures should be established and hung in an eye-catching place in the operation room.

 

The post operator should insist on daily inspection of the safety of the valves, switches and flow control devices connected to the canned heat source. Mainly to check the fuel tank, pipeline, breathing valve, thermostatic mat, gasket and other safety conditions, inspection should be recorded. The use unit shall prepare an emergency plan and formulate corresponding safety precautions.https://www.wickchafingfuel.com/


Related Industry Knowledge

Related Products

  • 6hrs Liquid Wick Chafing Fuel Quick Cap
  • Easy Heat Liquid Chafing Fuel
  • Adjustable Heat Chafing Fuel
  • Heat Liquid Chafing Fuel
  • Methanol Solid Gel Chafing Fuel With High Engrgy Output
  • 200G DEG Wick Chafing Fuel-the Safest Fuel For Buffet